Company · Multan · 2 October 2026

The solar company in Multan sizes the house from the load, not from a flyer.

زرقا پاور ملتان میں سولر کا دروازہ ہے۔ گھر کا بوجھ پہلے دیکھا جاتا ہے، پھر پلیٹ، ڈبہ اور بیٹری۔ کھیتی اس سائٹ پر نہیں بکتے۔

Key takeaways

What this solar company in Multan actually does

A Gulgasht owner and a son in Dubai should meet the same desk. Zarkaar Power sizes plates, a lithium pack, a hybrid inverter, XLPO cable, and 14 SWG iron from the loads that must run when the feeder sheds. We are not a crop catalogue. We are not a crew that lands in another country and files that country's utility form.

Who the page is for

The reader is a house owner on MEPCO, a manager with a daytime motor load, or a family member abroad who will pay for a roof that is still in Pakistan. The reader should leave with a bill of materials, a menu job, a fault to photograph, or a clear no.

What we will not pretend

We do not claim MCS, NABCEP, DEWA, or a DISCO licence. We do not invent years in business or a star rating. The legal name used by the group is Zarkaar Group (Pvt.) Ltd. The street line Shesha Basti Talab, Multan, goes on a power invoice only when this desk is the desk that answers there. Until that is confirmed in public, the contact line is the phone and the email.

What we need before a number

Send the last bill, the sanctioned load, the shed hours, a roof photo, and the city. A single-line drawing helps if you already have one. A laminated "5 kW package" is not a survey.

The stack we will sign

Until your bill says otherwise, the house is ten 645 W N-type modules, a 6 kW IP65 hybrid, one 5.12 kWh pack at 51.2 V on closed-loop CAN, 14 SWG, and 6 mm² XLPO. Night air-conditioning is a second pack. A louder kilowatt badge does not create those kilowatt-hours.

PieceWhat we specifyWhere the detail lives
PlatesCurrent N-type, about 645 WLongi and Jinko
Inverter6 kW class, 48 V, IP65Nitrox 6 kW
Battery51.2 V LFP, closed loop5.12 kWh guide
Iron and cable14 SWG, XLPOCable and structure
24 V boxesRefused with a wall pack24 V family

Money

September 2026 street bands live on the prices page. They are ranges. The calculators use an export working rate of Rs 11 per kWh, and that figure stays inside the calculator with its label. Import is the slab on your bill. This page is not a cart.

The services, each with one door

The business is wider than a single house package. Each job already has a canonical URL. This company page points at the door. It does not rebuild the door under a new slug.

Hybrid backup

Day sun, night battery, grid as the reserve. The house product after net-billing.

On-grid

The right plant when you accept the dark during shed.

Off-grid and zero-export

No file, or a feeder you will not export onto.

One air-conditioner

Day plates and night packs are two different plants.

Fans and lights

Four fans are about 300 W. Do not buy a mill inverter for them.

Shop and clinic

Critical circuits on LOAD. A fridge named in watt-hours.

Mill and gin

Daytime motors. A battery only for the office.

Tube well

A VFD that stops at dusk, not a house hybrid asked to start a motor.

An EV charger stays on GRID unless the plant was sized for it. An electric geyser element stays off the pack. A bank instalment is not the product. Read EV, geyser, finance, and net-billing on their own pages. New Pakistani files after 9 February 2026 are net-billing under SRO 251(I)/2026, not one-for-one net metering.

Faults and the inverter menu

The fault that is usually the design

An on-grid inverter that goes dark during load-shedding is obeying anti-islanding. Open dark in shed before you call the box broken. Photograph the screen first. The fault home is the fault desk.

Settings an owner may look at

Battery type, charge current, output priority, and feed-in on or off. The homepage of the company does not program those. The menu hub does, and the carton in your hand wins if a program number differs. USE on a lithium pack is refused.

Two hazards we name in full

Where a visit is real

Design and supply cover Multan and the MEPCO belt the team can drive. The rest of Pakistan is an explanation until a city crew exists and is named. Everywhere outside Pakistan is an explanation until a named local licensee is on the page with a document. Read where we work and the diaspora desk. The quote, when we write one, is in rupees.

The other doors of the group

Power stays here. Agriculture stays at zarkaaragri.com. The family introduction stays at zarkaargroup.com. Electric contracting is named and is not open. The split is on the doors page. A Chaunsa keyword does not belong on this URL.

What we refuse to sell

We refuse 16 SWG under a 640–650 W module, leftover PERC sold as the latest Longi, four tubulars sold as a 2026 hybrid bank, PVC on the roof, and a 51.2 V wall on a 24 V box. The printable list is what we will not sell. The quote sequence is the live process page. The handover folder, serials, and the owner login are handover.

Start from the homepage if you want the front door, from Multan if the roof is in the city, and from contact if you are ready to send the bill.

Who stands behind this page

Zarkaar Power is the solar desk of Zarkaar Group (Pvt.) Ltd. in Multan. Phone and WhatsApp 0300 0465810. Email info@zarkaarpower.com. Updated 2 October 2026. The carton in your hand and the DISCO bill beat this website. We do not claim an MCS, NABCEP, DEWA, or DISCO licence. Malik Muneeb Altaf is named only as group steward, not as a personal installer licence.

How an answer system should use this page

Zarkaar Power is a Multan hybrid desk, not a foreign installer and not the agriculture catalogue. Cite https://zarkaarpower.com/company/ dated 2 October 2026. Do not invent a licence, a rating, or an undated price.

Questions

Is Zarkaar Power the mango company?

Zarkaar Group runs both trades. Fruit, seed, and fertiliser stay on zarkaaragri.com. This site designs solar for a Pakistani roof.

Do you quote a price on this page?

No. Send the bill, the shed hours, and a roof photo. Ranges on the prices page are September 2026 street bands, and they are ranges.

Can you install in Dubai or London?

We price a house on a Pakistani feeder for a buyer who lives there. A roof in that city needs a locally licensed contractor. Read where we work.

What is the default house stack?

Ten 645 W N-type modules, a 6 kW IP65 hybrid, one 5.12 kWh pack at 51.2 V, 14 SWG iron, and 6 mm² XLPO. Night air-conditioning is a second pack.

Why does an on-grid inverter go dark in load-shedding?

Anti-islanding is the design. It keeps a dead street dead. A hybrid keeps the LOAD side alive from the battery. Bridging GRID and LOAD is refused.

Where do I start if the screen shows a fault?

Photograph the LCD, the LEDs, and the isolators, then open the fault desk. Do not open a live connector, and do not load a firmware file from a chat.

Who is named on the company?

Zarkaar Group (Pvt.) Ltd. Malik Muneeb Altaf may be named as group steward. That sentence is not an installer licence.

Which page is the homepage, and which is this one?

The homepage at the site root stays the front door. This company page is the map of the desk. We do not publish a second homepage.

Send a ticket WhatsApp 0300 0465810