Process

Survey, split DB, torque, earth, then paperwork.

1

Load + roof

Run the calculators, then a site visit: parapet, tanks, shade, existing earth, DB photos.

2

BOM

Current plate SKU (X10 / Tiger Neo 3.0 / volume N-type), hybrid IP65, LFP 5 kWh default, 14 SWG iron, XLPO, SPD, labour. You see the same numbers as the website.

3

Backup split

Essential vs non-essential circuits. Hybrid backup port is not the whole house unless we sized it that way.

4

Install

14 SWG iron, XLPO, labelled isolators, earth test, inverter firmware, battery CAN.

5

Commission

String Voc, Isc, clamp torque, Wi-Fi dongle, customer walkthrough of backup vs grid.

6

Net-billing

Only if you want it. DISCO file, green meter on their demand notice, PPIB installer if the size needs it. Filing guide.

7

Handover + O&M

App login, serials, backup vs non-backup walkthrough, wash schedule. Warranty and cleaning.