Glossary · Grid & policy · Basic · Pakistan 2026

Net-billing is rupees, not a 1:1 unit swap.

Net-billing means the DISCO buys your export at a wholesale-like rate (NAEPP, we use Rs 11) and sells you import at your slab (often Rs 37–55). Two columns, two prices.

People also search sro 251 net billing pakistan prosumer 2026

Key takeaways

Advantages and disadvantages

ADVANTAGE
  • Old net-metering (pre–9 Feb 2026 agreements) swapped units 1:1. That is grandfathered until the contract dies (SRO 547). New files are net-billing. Contract 5 years. Size ≤ sanctioned load, max 1 MW.
  • You can photograph serials, protocol, and a shed test.
DISADVANTAGE
  • 1:1 promised on a new 2026 file
  • Green meter as a shop SKU
  • Array bigger than sanctioned load

What it is

Old net-metering (pre–9 Feb 2026 agreements) swapped units 1:1. That is grandfathered until the contract dies (SRO 547). New files are net-billing. Contract 5 years. Size ≤ sanctioned load, max 1 MW.

In Pakistan 2026

This killed the “put extra plates and bank units at night” business model. Self-consume. Battery if the feeder sheds. Filing is optional if you never export.

How we spec it

If you file: DISCO documents, inspection, demand notice, their meter. Shop “green meter Rs 18,500” is not the demand notice. Read the DISCO guide.

Numbers you can actually use

Street ranges, not a quotation. Confirm the carton the week you book.

Thing2026 numberHow to use it
Export~Rs 8–13 / kWhCalculator Rs 11
ImportRs 37–55 classYour slab
Start date9 Feb 2026New files

Worked example — Hyderabad

Take a 10 kW-class hybrid in Hyderabad (HESCO, ~5.3 PSH). 16 × 645 W is 10.32 kW DC. Derated yield ≈ 10.32 × 5.3 × 0.78 ≈ 42.7 kWh on a clean day — then heat derate before paperwork. This page (Net-billing) is the piece of that plant people skip on WhatsApp. If your quote cannot survive this Hyderabad sentence, it will not survive May. Open the calculator with city set to Hyderabad, and the lookup map for a stocking dealer — not a green-meter SKU.

Keywords this lesson actually answers

People land here asking sro 251, net billing pakistan, prosumer 2026. The honest 2026 answers still collapse to: N-type plates with flash, IP65 hybrid with GRID vs LOAD, 51.2 V LFP on CAN, 14 SWG, XLPO, derate 0.78, and net-billing at ~Rs 11 export if you file with HESCO. Everything else on this page is how not to get robbed while buying those things.

Internal links worth clicking before you pay

Size: system sizing · Policy: net-billing · Battery: LFP · Buy: checklist · Shops: near you · City climate: Hyderabad · Numbers: calculators.

How shops fail this

WALK AWAY

1

1 promised on a new 2026 file

WALK AWAY

Green meter as a shop SKU

Green meter as a shop SKU

WALK AWAY

Array bigger than sanctioned load

Array bigger than sanctioned load

FAQ — Net-billing

Do I must file?

Only if you want to export legally. Hybrid can self-consume without export.

Is my old meter 1:1?

If the agreement was executed before 9 Feb 2026, usually yes until expiry. Confirm in writing.

≤25 kW NEPRA licence?

Separate generation licence was dropped for ≤25 kW in Aug 2026 talk — DISCO files it. Still not a shop sticker.

Read next

glossary

Net-metering vs net-billing

One word changed. The payback spreadsheet changed more.

glossary

NAEPP

NAEPP is the cheap number they buy your noon extra at.

glossary

Sanctioned load

Sanctioned load is the DISCO cap on your solar size.

guide

How to apply for LESCO net-billing

LESCO is a file. Hall Road is a shop.

glossary

MDI

Maximum demand indicator. Factories pay for peaks solar may not erase.

glossary

DISCO

Your distribution company: LESCO, KE, MEPCO… The file lives here, not on Hall Road.

DISCO filing guide Shops near you All lessons

Educational page, September 2026. Not a DISCO filing, not a live quotation, not medical or bank advice. SRO 251(I)/2026 net-billing for new files after 9 Feb 2026.